| Save | S.N. | Project Title | Public Entity Name |
Published |
Deadline |
Procurement Type | Location |
Security |
Doc Fee |
|
|---|---|---|---|---|---|---|---|---|---|---|
| 751 |
Construction of HT and LT line at different place of kalikot district in which pole are already erected on previous years
nea/kdc/2082/083-ew-02 |
NEA, Kalikot Distribution Center | 30/03/2026 |
29/04/2026
(27 days) |
Works
(NCB)
Electricity /Power |
Karnali
Kalikot |
60 k | 3 k | ||
| 752 |
The Construction Of Jilla Mahottari, Aaurahi Na.Pa.3,Shree Hira Soanabati Adharbhut Bidyalayako Bhawan Nirman Tatha Starunnati.
moec/ncb/works/2082-083/14 |
Ministry of Education and culture | 30/03/2026 |
29/04/2026
(27 days) |
Works
(NCB)
Building / Hall / Lab |
Madesh
Mahottari |
1 lakh | 3 k | ||
| 753 |
The Construction Of Jilla Mahottari,Sonma Ga. Pa.4 Shree Janta Ma. Bi. Ko Adhuro Bhawan Nirman
moec/ncb/works/2082-083/13. |
Ministry of Education and culture | 30/03/2026 |
29/04/2026
(27 days) |
Works
(NCB)
Building / Hall / Lab |
Madesh
Mahottari |
90.5 k | 3 k | ||
| 754 |
The Construction Of Jilla Mahottari Sonma Ga. Pa.3 Sahid Comred Ramchalitar,Ramdeb, Singheshwor,Bhagyanarayan,RajendraBindeshwor Bidyalaya Khaknako Starunnati
moec/ncb/works/2082-083/12 |
Ministry of Education and culture | 30/03/2026 |
29/04/2026
(27 days) |
Works
(NCB)
Building / Hall / Lab |
Madesh
Mahottari |
1 lakh | 3 k | ||
| 755 |
Construction of Physical infrastructure at Dangdunge Danda Film City in Dolakha
moct/tdpkat/w/ncb/082/83-3 |
Tourism Development Project,Unit Office Kathmandu | 30/03/2026 |
29/04/2026
(27 days) |
Works
(NCB)
Building / Hall / Lab |
Bagmati
Kathmandu |
3 lakh | 3 k | ||
| 756 |
Construction of Sattal/Bhjan Mandal at Kumari Mandir Premises
moct/tdpkat/w/ncb/082/83-2 |
Tourism Development Project,Unit Office Kathmandu | 30/03/2026 |
29/04/2026
(27 days) |
Works
(NCB)
Religious/Tourism Site |
Bagmati
Kathmandu |
45 k | 3 k | ||
| 757 |
Construction of Physical infrastructure at Gita Mata Dhyankendra
moct/tdpkat/w/ncb/082/83-1 |
Tourism Development Project,Unit Office Kathmandu | 30/03/2026 |
29/04/2026
(27 days) |
Works
(NCB)
Religious/Tourism Site |
Bagmati
Kathmandu |
45 k | 3 k | ||
| 758 |
Construction of Jiri Technical School Hostel Building at jiri,Dolakha
jirimun/works/2082/083/ncb-29 |
Jiri Municipality, Dolakha | 30/03/2026 |
29/04/2026
(27 days) |
Works
(NCB)
Building / Hall / Lab |
Bagmati
Dolakha |
1.8 lakh | 3 k | ||
| 759 |
Upgrading of Pokhara Dedgaun Jhyalbas(4th Package) Dumkibas- Triveni- Hupsekot Ga.Pa. Nawalpur
ido-naw(bse)-ncb-w-ug-03-2082/83 |
Infrastructure Development Office, kawasoti, Nawalparasi(Bardaghat Susta East), Gandaki Province | 30/03/2026 |
29/04/2026
(27 days) |
Works
(NCB)
Road |
Lumbini
NawalParasi |
15 lakh | 5 k | ||
| 760 |
Construction of Danda Kottadi Connecting Motorable Bridge, Kawasoti-14, Nawalpur
ido-naw(bse)-ncb-w-brd-02-2082/83 |
Infrastructure Development Office, kawasoti, Nawalparasi(Bardaghat Susta East), Gandaki Province | 30/03/2026 |
29/04/2026
(27 days) |
Works
(NCB)
Bridge/Culvert |
Lumbini
NawalParasi |
18 lakh | 5 k | ||
| 761 |
Construction of Patthar Khola Motorable Bridge
ido-naw(bse)-ncb-w-brd-01-2082/83 |
Infrastructure Development Office, kawasoti, Nawalparasi(Bardaghat Susta East), Gandaki Province | 30/03/2026 |
29/04/2026
(27 days) |
Works
(NCB)
Bridge/Culvert |
Lumbini
NawalParasi |
17.9 lakh | 5 k | ||
| 762 |
Nagarpalika ko Bibhinna Sthan(11 woda) maa Sadak Marmat Tatha Starronnati Karya
ggm/works/ncb/20/2082/083 |
Gauriganga Municipality, Chaumala Kailali | 30/03/2026 |
29/04/2026
(27 days) |
Works
(NCB)
Road |
Sudur Pashchim
Kailali |
1.5 lakh | 3 k | ||
| 763 |
Siraha , Dhangadimai Na.Pa. 7, Paswan Tol ma Samudayik Bhaban nirman
99-idosir-bui-2082-083 |
Infrastructure Development Office (IDO), Siraha | 30/03/2026 |
29/04/2026
(27 days) |
Works
(NCB)
Building / Hall / Lab |
Madesh
Siraha |
86 k | 3 k | ||
| 764 |
Churiya Bachat tatha Rin sahakari sanstha ko Paschimpatti ko ailani jagga ma samudayik bhaban nirman karya Dhangadhimai Nagarpalika Wada No.12 simaltoki, Siraha
98-idosir-bui-2082-083 |
Infrastructure Development Office (IDO), Siraha | 30/03/2026 |
29/04/2026
(27 days) |
Works
(NCB)
Building / Hall / Lab |
Madesh
Siraha |
73 k | 3 k | ||
| 765 |
Siraha Dhangadhimai Na.Pa. Bibhinna Sadak ko astarunnati
97-idosir-road-2082-083 |
Infrastructure Development Office (IDO), Siraha | 30/03/2026 |
29/04/2026
(27 days) |
Works
(NCB)
Road |
Madesh
Siraha |
73 k | 3 k | ||
| 766 |
Dharamdew Ghar dekhi Khilaha samma ko Sadak ma astarunnati karya Bhagwanpur Ga.Pa. Wada No. 5 Lalpur siraha
96-idosir-road-2082-083 |
Infrastructure Development Office (IDO), Siraha | 30/03/2026 |
29/04/2026
(27 days) |
Works
(NCB)
Road |
Madesh
Siraha |
49 k | 3 k | ||
| 767 |
Siraha ko Bhagwanpur ko Paraul ma Saburi Mandal ko Ghar dekhi Bishnudew Mandal ko Ghar hudai Dhokai Pokhari samma nala nirman karya
95-idosir-road-2082-083 |
Infrastructure Development Office (IDO), Siraha | 30/03/2026 |
29/04/2026
(27 days) |
Works
(NCB)
Road |
Madesh
Siraha |
61 k | 3 k | ||
| 768 |
Jilla Siraha Bhagwanpur Paraul Aa.Bi. Dekhi Dakanimai sthan samma sadak dhalan & Siraha ko Ga.Pa. Bhagwanpur ko Paraul Dakanimai sthan dekhi Hulaki sadak samma Krishi sadak
94-idosir-road-2082-083 |
Infrastructure Development Office (IDO), Siraha | 30/03/2026 |
29/04/2026
(27 days) |
Works
(NCB)
Road |
Madesh
Siraha |
1.1 lakh | 3 k | ||
| 769 |
Jilla Siraha Bhagwanpur Wada No. 1 Sinuriya ma Puspendra Ghar dekhi dakshin Pokhari samma adhuro sadak nirman
93-idosir-road-2082-083 |
Infrastructure Development Office (IDO), Siraha | 30/03/2026 |
29/04/2026
(27 days) |
Works
(NCB)
Road |
Madesh
Siraha |
61 k | 3 k | ||
| 770 |
Siraha Mirchaiya Na.Pa. wada no. 5 Shanti samudayik bhaban wall and wada no. 6 Nepal Sudi samaj adhuro bhaban nirman
92-idosir-bui-2082-083 |
Infrastructure Development Office (IDO), Siraha | 30/03/2026 |
29/04/2026
(27 days) |
Works
(NCB)
Building / Hall / Lab |
Madesh
Siraha |
73 k | 3 k | ||
| 771 |
Siraha Naraha Ga.Pa. 1 Devipur dekhi Golbazar Na.Pa. 11 Balkawa samma sadak astarunnati
91-idosir-road-2082-083 |
Infrastructure Development Office (IDO), Siraha | 30/03/2026 |
29/04/2026
(27 days) |
Works
(NCB)
Road |
Madesh
Siraha |
73 k | 3 k | ||
| 772 |
Siraha Bhagwanpur Ga.Pa. 3 Aa.Bi. Gairasaha ko adhuro Bhaban nirman karya
90-idosir-bui-2082-083 |
Infrastructure Development Office (IDO), Siraha | 30/03/2026 |
29/04/2026
(27 days) |
Works
(NCB)
Building / Hall / Lab |
Madesh
Siraha |
67 k | 3 k | ||
| 773 |
Siraha Golbazar Na.Pa. 7 Samudayik Bhaban nirman
89-idosir-bui-2082-083 |
Infrastructure Development Office (IDO), Siraha | 30/03/2026 |
29/04/2026
(27 days) |
Works
(NCB)
Building / Hall / Lab |
Madesh
Siraha |
1.1 lakh | 3 k | ||
| 774 |
Siraha, Dhangadhimai Na.Pa. 12, Chetharu Pokhari najik Samudayik Bhaban nirman
88-idosir-bui-2082-083 |
Infrastructure Development Office (IDO), Siraha | 30/03/2026 |
29/04/2026
(27 days) |
Works
(NCB)
Building / Hall / Lab |
Madesh
Siraha |
86 k | 3 k | ||
| 775 |
Siraha, Dhangadhimai Na.Pa. 12, Simaltoki Durga Mandir Samudayik mandir nirman
87-idosir-bui-2082-083 |
Infrastructure Development Office (IDO), Siraha | 30/03/2026 |
29/04/2026
(27 days) |
Works
(NCB)
Religious/Tourism Site |
Madesh
Siraha |
86 k | 3 k | ||
| 776 |
Siraha Bhagwanpur 2 Gamahariya ko Hulaki Sadak dekhi Uttar Sambhu Sah ko Ghar samma RCC dhalan
86-idosir-road-2082-083 |
Infrastructure Development Office (IDO), Siraha | 30/03/2026 |
29/04/2026
(27 days) |
Works
(NCB)
Road |
Madesh
Siraha |
61 k | 3 k | ||
| 777 |
Siraha Bhagwanpur 2 Gamahariya ko Ram Awatar Mandal Ghar najik ko purano dhalan dekhi Manilal Bhagat ko Ghar samma RCC dhalan
85-idosir-road-2082-083 |
Infrastructure Development Office (IDO), Siraha | 30/03/2026 |
29/04/2026
(27 days) |
Works
(NCB)
Road |
Madesh
Siraha |
61 k | 3 k | ||
| 778 |
Siraha Bhagwanpur 1 Sinuriya Anarudha Sah ko Ghar dekhi Dakshin Mul sadak ma RCC dhalan
84-idosir-road-2082-083 |
Infrastructure Development Office (IDO), Siraha | 30/03/2026 |
29/04/2026
(27 days) |
Works
(NCB)
Road |
Madesh
Siraha |
61 k | 3 k | ||
| 779 |
Siraha Bhagwanpur Ga.Pa. 5 Paraul Dhokai Pokhari dekhi Purwa Lahan Thadi samma ko sadak astarunnati
83-idosir-road-2082-083 |
Infrastructure Development Office (IDO), Siraha | 30/03/2026 |
29/04/2026
(27 days) |
Works
(NCB)
Road |
Madesh
Siraha |
61 k | 3 k | ||
| 780 |
Siraha Golbazar Na.Pa. 1, Thakuri Tol dekhi Sarre Khola samma ko sadak (Bato nirman)
82-idosir-road-2082-083 |
Infrastructure Development Office (IDO), Siraha | 30/03/2026 |
29/04/2026
(27 days) |
Works
(NCB)
Road |
Madesh
Siraha |
1.2 lakh | 3 k | ||
| 781 |
Siraha Karjanaha 6 Betha ko Sadak nala tatha School ko adhuro karya sampann garne
81-idosir-road-2082-083 |
Infrastructure Development Office (IDO), Siraha | 30/03/2026 |
29/04/2026
(27 days) |
Works
(NCB)
Road |
Madesh
Siraha |
73 k | 3 k | ||
| 782 |
Ganesh Chaulagai ko Ghar dekhi Hari ko khet samma pakki nala nirman karya Karjanaha Na.Pa. 1,Siraha
80-idosir-road-2082-083 |
Infrastructure Development Office (IDO), Siraha | 30/03/2026 |
29/04/2026
(27 days) |
Works
(NCB)
Road |
Madesh
Siraha |
98 k | 3 k | ||
| 783 |
Gaushalama Prangarik Mal Karkhana( Gadeula Mal) Nirman garne Karya, Bedkot-4, Kanchanpur
27/ncb/trcw/2082/083 |
Bedkot Municipality, Kanchanpur | 30/03/2026 |
29/04/2026
(27 days) |
Works
(NCB)
Building / Hall / Lab |
Sudur Pashchim
Kanchanpur |
1.1 lakh | 3 k | ||
| 784 |
Construction of Drain at North side of Nabaki Pond and Construction work in Jhanda bala Pond at Ward no. 20, Janakpurdham
14/2082/83/ncb/works |
Janakpurdham Sub-Metropolitan City | 30/03/2026 |
29/04/2026
(27 days) |
Works
(NCB)
Water / Irrigation / Canal |
Madesh
Dhanusha |
75 k | 3 k | ||
| 785 |
Construction of Treatment Plant and RCC Reservoir of Khalanga Khanepani Yojana Chandannath Municipality, Jumla
08/082-83/ncb/works/wsp/wiwdo-jumla |
Water Supply, Irrigation & Energy Development Office, Jumla | 30/03/2026 |
29/04/2026
(27 days) |
Works
(NCB)
Water / Irrigation / Canal |
Karnali
Jumla |
2.5 lakh | 3 k | ||
| 786 |
Supply ,Installation and Management of Civil Engineering Laboratory Equipment Including ICT Resources, Mathematical Tools and Field Safety (Medical) Kits for Academic and Laboratory use.
smss/01/082-83 |
Shree Mukundeshwari Secondary School, Kakani-3, Nuwakot | 30/03/2026 |
15/04/2026
(13 days) |
Goods
(Sealed Quotation)
Lab Equipment |
Bagmati
Nuwakot |
50 k | 1 k | ||
| 787 |
The Procurement of Manpower Service Supply for Geological and Geotechnical Investigation Work
nea-gid-2082/83-sq-01 |
NEA, Soil Rock and Concrete Laboratory | 30/03/2026 |
15/04/2026
(13 days) |
Goods
(Sealed Quotation)
HR/Manpower |
Bagmati
Lalitpur |
50 k | 1 k | ||
| 788 |
Supply and Deliver Diesel and Petrol Mini Tiller -7 H.P. at Jiri Munipality
jirimun/goods/2082/083/sq-30 |
Jiri Municipality, Dolakha | 30/03/2026 |
15/04/2026
(13 days) |
Goods
(Sealed Quotation)
Agriculture/Animal |
Bagmati
Dolakha |
35 k | 1 k | ||
| 789 |
Procurement of USG Machine-Low End
bh/ncb/goods/41/082/83 |
Bharatpur Hospital, Bharatpur Chitwan | 30/03/2026 |
29/04/2026
(27 days) |
Goods
(NCB)
Medical/Healthcare |
Bagmati
Chitwan |
1.2 lakh | 3 k | ||
| 790 |
Procurement of High Deck Truck as per approved specification
15/2082/83/ncb/goods |
Janakpurdham Sub-Metropolitan City | 30/03/2026 |
29/04/2026
(27 days) |
Goods
(NCB)
Vehicle/Automobile |
Madesh
Dhanusha |
90 k | 3 k | ||
| 791 |
NEA Electrical Safety Risk Assessment and Guideline Preparation
nea/eelrd/eoi/2082/83-01 |
NEA, Energy Efficienfy and Loss Reduction Department | 30/03/2026 |
29/04/2026
(27 days) |
Consultancy
(QCBS)
Study/Survey/Research |
Bagmati
Kathmandu |
N/A | 0 | ||
| 792 |
Construction of Truss Building for Kalika Mandir of Chhatradev 08, Arghakhanchi
tdo/rup/sq/082/083-183 |
Tourism Division Office, Rupandehi | 30/03/2026 |
15/04/2026
(13 days) |
Works
(Sealed Quotation)
Building / Hall / Lab |
Lumbini
Arghakhanchi |
40 k | 1 k | ||
| 793 |
Construction Of Sabdaha Sthal at Siyari 07, Rupandehi
tdo/rup/sq/082/083-182 |
Tourism Division Office, Rupandehi | 30/03/2026 |
15/04/2026
(13 days) |
Works
(Sealed Quotation)
Religious/Tourism Site |
Lumbini
Rupandehi |
40 k | 1 k | ||
| 794 |
Completion Of Existing Temple and Footpath works at Rudrapath, Butwal 08, Rupandehi
tdo/rup/sq/082/083-180 |
Tourism Division Office, Rupandehi | 30/03/2026 |
15/04/2026
(13 days) |
Works
(Sealed Quotation)
Religious/Tourism Site |
Lumbini
Rupandehi |
30 k | 1 k | ||
| 795 |
Construction Of Debikasthan Temple at Bhumikasthan 2, Arghakhanchi
tdo/rup/sq/082/083-179 |
Tourism Division Office, Rupandehi | 30/03/2026 |
15/04/2026
(13 days) |
Works
(Sealed Quotation)
Religious/Tourism Site |
Lumbini
Arghakhanchi |
20 k | 1 k | ||
| 796 |
Construction of Compound Wall at Shankarnagar Banbihar Anusandhan Kendra Tilottama 1,2 Rupandehi
tdo/rup/sq/082/083-178 |
Tourism Division Office, Rupandehi | 30/03/2026 |
15/04/2026
(13 days) |
Works
(Sealed Quotation)
Road |
Lumbini
Rupandehi |
20 k | 1 k | ||
| 797 |
Completion Of Existing Kotahi Temple at Bijaynagar 3, Kapilvastu
tdo/rup/sq/082/083-177 |
Tourism Division Office, Rupandehi | 30/03/2026 |
15/04/2026
(13 days) |
Works
(Sealed Quotation)
Religious/Tourism Site |
Lumbini
Kapilvastu |
30 k | 1 k | ||
| 798 |
Construction Of Multipurpose Hall at Shringeshwor Dham Tilottama 04, Rupandehi
tdo/rup/sq/082/083-176 |
Tourism Division Office, Rupandehi | 30/03/2026 |
15/04/2026
(13 days) |
Works
(Sealed Quotation)
Building / Hall / Lab |
Lumbini
Rupandehi |
40 k | 1 k | ||
| 799 |
Deuti Bajai Mandhir Nirman, Bheriganga-8
bgm/idb/sq/2082/083-30 |
Bheriganga Municipality,Karnali | 30/03/2026 |
15/04/2026
(13 days) |
Works
(Sealed Quotation)
Religious/Tourism Site |
Karnali
Surkhet |
30 k | 1 k | ||
| 800 |
Procurement of Mathillo Trisumati Khanepani Aayojana Bhumlu-5
brm/ncb/ws/02/82/083 |
Bhumlu Rural Municipality | 30/03/2026 |
14/04/2026
(12 days) |
Works
(NCB)
Water / Irrigation / Canal |
Bagmati
Kavrepalanchok |
60 k | 3 k |